Browse all practice questions for the Logistics Basic Officer Leader Course (LOG BOLC) Exam 7 Practice. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

Logistics Basic Officer Leader Course (LOG BOLC) Exam 7 Practice course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • Coordinating involves interfacing with organizations that participate directly or indirectly with the movement of personnel, supplies, and forces supporting deployment, redeployment, and distribution operations.
  • What does LAD stand for in deployment planning?
  • The mobility force liaison is normally which center?
  • What is required regarding securing materials during rail movement?
  • Which of the following is an allowed practice when naming MSRs?
  • A geographic boundary is a typical location for a checkpoint?
  • Which step focuses on BBPCT requirements?
  • Which statement best defines the Available-to-load date (ALD)?
  • BBPCT stands for which?
  • What is the Distribution Network design plan?
  • There are how many steps to making a movement plan and deployment checklist?
  • DD 1750 is a packing list.
  • When deployed, which duties may the MCT perform?
  • In RSOI, what does the Port of Debarkation (POD) refer to?
  • What should be done to vehicle configuration based on movement order?
  • What is ATP 3-35?
  • The CDDP is a tool for what purpose?
  • Who is responsible for preparing its vehicles and equipment for rail movement?
  • Where is the ARTRANS Operations Center located?
  • POE stands for which term?
  • Which of the following is an example of Other Convoy Commander-instituted measures?
  • Who conducts the inspection in the Call Forward Area?
  • What is the primary purpose of the marshalling area in the APOE?
  • The Mobilization Movement Plan is used to move which type of units?
  • Which of the following is listed as a critical point example?
  • To achieve integration in RSOI planning, what must be true?
  • Ten MCTs per 1000 miles of each Main Supply Route (MSR) in DIV/Corps, Theater & Port is:
  • Which planning tool is used to visually represent the MSR network?
  • The Deployment Movement Plan moves AC and RC from Mobilization site or Installation to POE.
  • How much documentation is required for civilian operations?
  • The A/DACG provides liaison to which mobility force component, normally?
  • Gondola cars sides are designed to do what?
  • Who is responsible for area control at the BDE rear area?
  • UDL data is used to produce which item?
  • What does CRE stand for?
  • In rail operations, what does AAR stand for?
  • How much documentation is required for military operations?
  • Which option is NOT one of the four APOE areas?
  • In Movement Request Process, which step comes immediately before Origin MCT Closes TMR?
  • There are how many steps to making a movement plan and deployment checklist?
  • What is Phase I of deployment?
  • Which term describes moving units from ports to theater staging bases or forward to the TAAs?
  • The CDDP is a tool used primarily for what purpose?
  • Which step ensures the Movement Plan remains current?
  • ATP 3-35 is the Army publication covering which topic?
  • Final inspection compliance is referenced to which standard in rail operations?
  • What movement control asset closes out the shipment (TMR)?
  • A checkpoint would typically be established at which location?
  • What does the Unit Deployment List represent?
  • Which principle ensures that units maintain their organization and capabilities during the RSOI flow?
  • ADACG stands for Arrival/Departure Airfield Control Group Operations.
  • Which is an example of a critical point?
  • Which statement best reflects unity of command in RSOI planning?
  • What are the three primary factors affecting onward movement in RSOI planning?
  • Route synchronization is the responsibility of which individuals at each echelon with area jurisdiction?
  • APOD stands for?
  • One MCT per Large Seaport is best described as:
  • Why do we not tell them where sensitive items are?
  • What does EAD stand for in deployment planning?
  • What are the two types of convoy control?
  • Which facility type would be most likely to have insufficient water depth or pier length?
  • MCTs are normally OPCON to which level?
  • What is Step 5 of the movement plan?
  • What is route synchronization?
  • Which statement accurately describes an APOD?
  • What does the A/DACG do when no mobility force is available?
  • Which unit provides dispatch to support unit preparation for movement?
  • Which APOE area is designated for marshaling operations?
  • ALD stands for?
  • Which statement correctly contrasts planned and immediate movements?
  • What must the commander provide at the rail site?
  • What is Step 4 of the movement plan?
  • Boxcars are ideal for commodities requiring weather protection or pilferage. Which of the following lists a correct example?
  • What is Step 6 of the movement plan?
  • Which plan moves AC and RC from Mobilization Site or Installation to POE?
  • What are the four routing principles?
  • What does AMC stand for?
  • What organization is the first point of contact for other DoD organizations needing Army common user transportation?
  • Which statement defines the Unit Deployment List?
  • A reserved route is described as:
  • What two distinct tables are produced in Step 9?
  • Which description matches NTAT?
  • In the acronym RSOI, which term represents the initial phase?
  • What are infiltration rules?
  • Which statement best describes the MCT's authority over Air Force assets, host-nation rail, and Army watercraft?
  • How many Defense Freight Rail Interchange Fleet flatcars are there?
  • In a combination yard layout, which statement best describes the process?
  • Which unit type originates movement planning from the Mobilization Station?
  • Boxcars capacity description: which statement is accurate?
  • Which term is associated with bare beach facilities in the discussed categories?
  • Which option lists the four functional areas of APOE?
  • What is Step 3 of the movement plan?
  • The DD 7598 is which of the following?
  • ADACG stands for?
  • Which of the following is NOT a function of the A/DACG?
  • What does CRE stand for in this context?
  • What is the difference between a planned move and an immediate move?
  • Who ensures vehicles and equipment operators follow the instructions of the load team chief or loadmaster?
  • Which is a duty of the Chalk commander?
  • Which entities are included when coordinating movements?
  • The A/DACG coordinates with which parties?
  • Which step of the movement plan involves translating what needs to be moved into transportation terms?
  • What is the primary mission of the A/DACG?
  • Movement Control Teams (MCTs) are assigned to which battalion?
  • Passengers are grouped by categories in Step 2. Which grouping is specified?
  • A prohibited route is:
  • Which route is specifically identified for exclusive use and may be used for large maneuver unit movements?
  • Which statement correctly describes the responsibilities of the deploying unit and installation regarding major rail activities?
  • What is Step 2 of the movement plan?
  • What is the correct order of deployment phases from first to last?
  • At the point where the alert holding area transfers load control, to which entity is control transferred?
  • How many inches of clearance should be left around the brake wheel?
  • Which entity coordinates reception at the APOD alongside the A/DACG?
  • Which organization controls the Loading Ramp Area in the APOE?
  • What does POD stand for?
  • Which statement describes Red TAT?
  • Which of the following is NOT a RSOI phase?
  • What does PIC stand for in the context of movement coordination?
  • Which external stakeholders are coordinated with Step 8?
  • Which of the following is a routing principle that prevents congestion by dividing road space or time blocks?
  • A fixed-port facility is typically associated with which description?
  • Which statement best describes the MCT's authority over Air Force assets, host-nation rail, and Army watercraft?
  • Which document describes what we are taking when we deploy?
  • How are chain-like vehicles placed during a rail operation?
  • NTAT examples include which item?
  • Which type of route control measure closes that route to traffic?
  • BMCT stands for which of the following?
  • Which category is identified in Step 4 of the movement plan?
  • Which step involves maintaining the Movement Plan?
  • Which step involves movement mode selection?
  • Which statement describes a function of the movement program related to commercial movements?
  • UDL data can be used to produce which output?
  • What is the Location method of route scheduling?
  • What is the primary focus of Step 4 in the movement program?
  • How many people are in the BMCT?
  • If no mobility force is available, what action does the A/DACG take?
  • How many phases are there in deployment?
  • Which item is part of vehicle preparation requirements?
  • What is Step 1 of the movement plan?
  • Which organization normally exercises area control by utilizing the MCB to supervise specific areas and ensure compliance with the route synchronization plan?
  • Flatcars may be carried on which type of carrier?
  • How many DD 1750s are needed when shipping military assets?
  • AHA stands for which term in deployment planning?
  • The MCT is the first point of contact for which groups requiring Army common user transportation?
  • Common shortfall COAs include which option?
  • On a supervised route, what determines which traffic requires a movement credit?
  • Can Commanders gather intelligence from the area where the MCT operates?
  • What is required when naming MSRs?
  • Planned movement is identified in advance.
  • Rail requirements are found in which annex?
  • The Mobilization Movement Plan moves RC units from Home Station to a designated Mobilization site or MFGI.
  • Which plan moves Active Component and Reserve Component units from the mobilization site or installation to the Port of Embarkation (POE)?
  • Who is responsible for organizational control?
  • Which document encompasses everything we have on our property book and in the system?
  • In routing, how is high priority traffic typically assigned?
  • Which plan moves Reserve Component units from Home Station to a designated Mobilization site or Mobilization Force Generation Installation (MFGI)?
  • Which element is used to supervise specific areas and ensure compliance with the route synchronization plan?
  • Which step is specifically focused on producing the formal Unit Movement Plan?
  • What are the two types of loading ramps?
  • Flatcars are ideal for transporting which type of cargo?
  • What does MFGI stand for in movement planning?
  • Organization Equipment List includes which of the following?
  • ITV provides which primary purpose?
  • What is a bare beach facility?
  • The Unit Deployment List describes what?
  • The Movement Control Team (MCT) Executes Movement Control Missions.
  • How many soldiers are in a Movement Control Team (MCT)?
  • What is Phase II of deployment?
  • What describes the Organization Equipment List?
  • When identifying the Road Network / Recommend MSRs, which of the following is true?
  • What is the Call Forward Area in the APOE?
  • What is Step 7 of the movement plan?
  • Which description best matches a dispatch route?
  • NTAT stands for Not To Accompany Troops.
  • What does PSA stand for in port operations?
  • What does unity of command mean in RSOI planning?
  • Which units are moved under the Mobilization Movement Plan?
  • What does TMR stand for?
  • What is the initial step in introducing combat power into a theater?
  • Why do we not tell them where are sensitive items are?
  • What form number is used for the material shipping lane?
  • Which items are included on a Material Shipping Label?
  • For new series vehicles, what should you do to the windows?
  • What does staging in RSOI planning do?
  • What does the line number identify in Step 9?
  • How many inches do you need to overlap the rail car deck?
  • What are the two basic movements?
  • How much time do you have to unload vehicles?
  • Which routing principle is focused on assigning movement priorities to prevent bottlenecks?
  • What is a deploying unit responsibility at the Marshalling area?
  • Step 2 uses forecasts based on a 14-day planning cycle. Which statement is accurate?
  • Is the BMCT a subordinate unit of the MCT?
  • Who is responsible for receiving and staging discharge equipment at the port staging area?
  • Which statement best describes Yellow TAT?
  • Which plan moves RC units from Home Station to a designated Mobilization site or MFGI?
  • Which statement best describes a fixed port facility?
  • Which of the following is an example of a critical point?
  • How many inches of space should you leave between vehicles?
  • Which statement describes ALD?
  • Reception at the APOD is coordinated by which entities?
  • Which action is a function of the movement program related to shipments?
  • What is the Mobilization Movement Plan designed to do?
  • What is the Deployment Movement Plan designed to do?
  • Which area is NOT one of APOE's four functional areas?
  • What are the four parts of RSOI planning?
  • What does ITO stand for?
  • Which deployment phase covers Joint Reception Staging and Onward Movement and Integration?
  • Which statement best describes the relationship of the deploying unit and installation regarding major rail activities?
  • What is the route synchronization plan?
  • Where should warning placards be placed on hazardous cargo loads during rail movement?
  • RFID stands for which term?
  • Why do we establish checkpoints?
  • Which routing principle emphasizes using as many routes as possible?
  • Immediate movement is characterized by
  • How should new series vehicles be protected during transport?
  • Which of the following is NOT a water terminal location type?
  • What is the purpose of the CDDP?
  • Which form is used to indicate to the loadmaster that the inspection is complete?
  • There is one MCT assigned to APOE/D (Aerial Port of Embarkation/Debarkation) or SPOE/D distribution hub?
  • Checkpoints are established at locations including
  • Railheads are considered what?
  • Where do you gather information for the Synchronization Route plan?
  • What is a CSC?
  • Tie down angles are at a ...?
  • What are the two types of movement?
  • Why do we need Highway regulation (Route Synchronization) plans?
  • Why do we not tell them where sensitive items are?
  • What is the most important and common railcar?
  • Which of the following is NOT a Movement Control Mission?
  • In the Mobilization Movement Plan, RC units move from where to a Mobilization site?
  • Final inspection is performed after which action?
  • Which is a vehicle preparation requirement for rail movement?
  • Who has authority to issue Transportation Movement Releases?
  • Through which channel should SDDC assistance be requested?
  • All wheeled vehicles use what for a bridge gap?
  • Which step is responsible for determining how personnel and equipment will be moved to the POEs?
  • What is ATP 3-35?
  • What is the AHA in the APOE?
  • Which are the four Areas of the APOE?
  • What is an APOD?
  • What is the purpose of the MSR Checkpoint list in Step 6?
  • What is Phase IV of deployment?
  • What is Phase III of deployment?
  • In RSOI planning, reception includes which functional area?
  • What does MSL stand for?
  • What does allocating involve in movement control?
  • In-transit visibility (ITV) primarily provides the location of which assets?
  • Which element is included in Step 3 to determine capabilities?
  • Which is a characteristic of an unimproved port facility?
  • To which unit are Movement Control Teams normally assigned?
  • Identify Road Network / Recommend MSRs emphasizes that MSRs must be capable of supporting what?
  • NTAT shipments are normally shipped by which means?
  • RLD stands for?
  • MSR stands for
  • Deployment Movement Plan moves units from Mob site or Installation to which location?
  • Which are the four components listed as the principles of RSOI?
  • What is balance?
  • Who specifies the RDD?
  • Which of the following is NOT a movement control function?
  • Which step of the movement program involves assessing the distribution pattern?
  • Ammunition and fuel should not be carried as what during rail movement?
  • Which of the following is a component of organizational convoy control?
  • Coordinate logistical support for railhead operations includes which items?
  • What is route scheduling?
  • Which item is a responsibility of ARTRANS?
  • How many steps are there to making a movement plan and deployment checklist?
  • By the RDD, what must have occurred at the Port of Debarkation?
  • Which routes with a scheduled move are likely to require a movement credit?
  • What is required for bands used on rail movement?
  • Which activity is described as part of the planning function in movement control?
  • Which statement best defines unit integrity?
  • Which step involves preparing the Unit Movement Plan?
  • Who normally approves the recommended MSRs?
  • Within the movement program tables, which field indicates the priority of the shipment?
  • Planning involves considering both known and unknown factors.
  • How many DD 1750s are needed when shipping commercial assets?
  • What is synchronization in deployment operations?
  • What pallet type is built by the deploying unit?
  • Which statement describes external coordination in Step 8?
  • What does HS stand for in the mobilization context?
  • Who is the final approving authority for accepting rail loads?
  • Which is listed as a critical point example?
  • How many MCTs are allocated per committed Sustainment Brigade in Theater?
  • In routing, what does 'Route balance' mean?
  • What term describes an airfield designated to serve as an authorized port of entrance into a country?
  • What is the CDDP used for in deployment readiness assessment?
  • What does Balance refer to in this context?
  • In the Movement Request Process, which step occurs after Mode selection?
  • Which APOE area is designated for directing units forward to the main staging?
  • RDD stands for in deployment planning?
  • What is the purpose of the movement program?
  • MSL stands for Military Shipment Labels.
  • What does the movement program do?
  • Which annex contains rail requirements?
  • What is the Organization Equipment List?
  • Which statement about AAR loading rules is accurate?
  • Step 1 requires constant evaluation as the theater develops. Which item is explicitly mentioned?
  • True or False: Tracked vehicles do not always need to use spanners.
  • RLD is the date when unit must be prepared to depart origin (installation for AC; Mobilization Station for RC).
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy